We've added the new pocket door for the walk-in closet. Once we pulled down the drywall we found a pocket door frame already there. Yay!
The new plumbing for the tub and shower are complete. We ended up using 'shark bit' attachments, pex and some soldering.
We've moved the old tub drain for the new tub and added a drain for the shower.
We've added the framing for the new tub and poured the pre-pitch for the shower base.